Skip to Content
蹄兔
Toggle navigation
蹄兔
转换语言
中文
转换语言
Deutsch
English
Español
Français
Italiano
Português do Brasil
中文
登录
首页
关于
帮助
联系
搜索 蹄兔
转到
蹄兔的全部
蹄兔的全部
Titles
Subjects
Descriptions
搜索条件
清除筛选
筛选:
Date created tesim
July-September 1939
删除限定条件 Date created tesim: July-September 1939
« 上一页
|
31
-
40
共
98
|
下一页 »
按 relevance 排序
relevance
title (A-Z)
title (Z-A)
date ▲
date ▼
每页显示结果数
10 每页
10
每页
20
每页
50
每页
100
每页
以如下方式察看搜索结果:
列表
图片式展示
砌体式展示
搜索结果
Sculpin assisting blowing
描述:
Image take during the recovery efforts from July-September 1939 to raise the USS Squalus and return her to the Portsmouth Naval Yard.
创建日期:
July-September 1939
Baron
描述:
Image take during the recovery efforts from July-September 1939 to raise the USS Squalus and return her to the Portsmouth Naval Yard.
创建日期:
July-September 1939
3rd & Last lift almost gone. Immediately lifted and towed to port
描述:
Image take during the recovery efforts from July-September 1939 to raise the USS Squalus and return her to the Portsmouth Naval Yard.
创建日期:
July-September 1939
Wire clamps (flower pots) in position
描述:
Image take during the recovery efforts from July-September 1939 to raise the USS Squalus and return her to the Portsmouth Naval Yard.
创建日期:
July-September 1939
Diver being assisted at surface
描述:
Image take during the recovery efforts from July-September 1939 to raise the USS Squalus and return her to the Portsmouth Naval Yard.
创建日期:
July-September 1939
Aground at 90 feet, departing
描述:
Image take during the recovery efforts from July-September 1939 to raise the USS Squalus and return her to the Portsmouth Naval Yard.
创建日期:
July-September 1939
Congestion on stern of the U.S.S. Falcon
描述:
Image take during the recovery efforts from July-September 1939 to raise the USS Squalus and return her to the Portsmouth Naval Yard.
创建日期:
July-September 1939
Trying to get first pontoon in position
描述:
Image take during the recovery efforts from July-September 1939 to raise the USS Squalus and return her to the Portsmouth Naval Yard.
创建日期:
July-September 1939
Resting easy at 90 feet
描述:
Image take during the recovery efforts from July-September 1939 to raise the USS Squalus and return her to the Portsmouth Naval Yard.
创建日期:
July-September 1939
First bubble-first blow
描述:
Image take during the recovery efforts from July-September 1939 to raise the USS Squalus and return her to the Portsmouth Naval Yard.
创建日期:
July-September 1939
« 上一页
下一页 »
1
2
3
4
5
6
7
8
9
10
Toggle facets
限定搜索
采集
Recovery Photographs
97
学科
USS Squalus
97
USS Sculpin
2
USS Falcon
1
USS Sacramento
1
USS Wandank
1
Location
Duke Medical Center Archives
97
Year
1939
97